360 ft Boom, Air ConditionerBUYERS NOTICE:All work conducted at Luminant mine sites must be performed by Luminant Mining approved VendorsApproved Vendors for Transportation: Broussard Logistics (214) 253-2539 Vicky HarrisonNichols Transportation 903-987-5279 Anderson Truck Service 864-979-4859 Zach Morgan Approved ...
Open Operator Station, Fire Suppression System, 18.00R25 TiresThe engine started and ran. The drivetrain engaged in forward and reverse. The main components appear to be in place and operational.***Contact Sidney Mendes at 450-600-5458 or place an offer above.***
US EPA Label, Canopy, Auxiliary Hydraulics, Hydraulic Coupler, 114 in Bucket, Ejector Bucket. Its Fork Attachment is included.***THIS ITEM IS ELEGIBLE TO IMPORT INTO THE USA / HAS EPA******See the EPA Compliant by the MSHA Attached in the Documentation Section ...
Air Conditioner, Engine Brake, Air Ride Seat, Fire Suppression System, Tier 3, 2020 US EPA Label, Tailgate, 18.00R25 Tires***Contact Brynner Kong at 450-536-2456 or place an offer above.***