Previous Next
Bidding Ends
8 hours, 34 mins (Subject to early close)
Starting Bid
US $4,250
0 bids    Reserve not metHow Bidding Works
Bid Increment
US $250

  
You will confirm this bid on the next page. How Bidding Works How Bidding Works
Buy Now Price
US $10,500
ITEM DETAILS
Meter Reading
14,235 Hours
Serial #
30 kVA, 24 kW, 480 Volts 3 Phase, 120V & 240V Receptacles, Bottom Mounted Fuel Tank, S/A, Pintle Ring, ST225/75R15 Tires

There was no response from the engine when the key was turned. The main components could not be operationally checked. Parts and components are missing from the unit.


Inspection Report



Please note that you are bidding on an item offered without IronClad Assurance®. Only basic item condition details are provided for your review and consideration in a purchase decision.


Functionality
Description Rating Details  
Usage Reading 14,235.2 Hours Click here to open photos and videos of this item.  
(1)


Additional Photos
(21)
 
NON-DISPUTABLE
Related Equipment (Both Live and Sold)
480 Volts 3 Phase, John Deere 4045TF Engine, ...
480 Volts 3 Phase, John Deere 4045TF Engine, Fuel Tank, T/A Ball Hitch, 205/75D15 Tires. The engine started and ran. The generator was not tested for electrical output. The main components appear to be in place.“ ”
480 Volts, Skid Mounted The item requires and ...
480 Volts, Skid Mounted The item requires and electrical connection. The main components could not be operationally checked. The item is neither complete or operational. **Seller Comment: The motor is bad.**No title available. A bill of sale will be provided ...
45 kVA, 60 kW, 3 Phase, Isuzu 4LE2 ...
45 kVA, 60 kW, 3 Phase, Isuzu 4LE2 Diesel Engine, Bottom Mounted Fuel Tank, T/A, Electric Brakes, 225/75R15 Tires, Ultra Low Sulfur Diesel, Requires Diesel Exhaust FluidThere was no response from the engine when the key was turned. The main ...
120V / 240V Receptacles, Cat 3512 Engine, Electrical ...
120V / 240V Receptacles, Cat 3512 Engine, Electrical Switch Gear, Fuel Tank, T/A, 295/75R22.5 Tires The engine started and ran. The main components appear to be in place and operational. ***A new generator was installed at approximately 7,600 Hours. Please ...