| Features: |
Sleeper Cab, A/C, Heater, Power Windows, Iveco Diesel Engine, 316Kw Rated Power, 8 Speed Manual Transmission, No CE Certificate available from seller - No CE Label on Machine. Relevant Import Duties may apply. |
|
|
|
Meter Reading:
|
299,835 KM
|
|
Serial Number:
|
|
| Location: |
HRVATSKA, Croatia
|
|
Shipping:
|
See shipping details for important pickup requirements and to get a shipping estimate
|
|
Description:
|
As-is, where-is with no IronClad Assurance. See Details
|
|
Payment:
|
Payment due within 3 business days after auction. See Details
|
|
picture, brochure
|
|
|
| |
| General Appearance |
| Rated Power |
|
|
| Cab Type |
|
|
| Cabin Features |
|
|
| Engine Type |
|
|
| Transmission |
|
|
| Body |
|
|
| Tires |
|
|
|
General Appearance #1
|
| |
| Specifications |
| Hour Meter /Odometer Reading |
|
- IronPlanet makes no guarantees as to actual hours/miles; we can only report what can be visually observed.
|
|
Hour Meter /Odometer Reading
|
| Oil Sample Analysis |
| Oil sample analysis not available. |
|
Disputes:
As highlighted above, this item is offered As-Is, Where-Is, with no IronClad Assurance® protection. IronPlanet did not inspect this item and claims no responsibility for the condition or description. A buyer may not submit a dispute claim on this item.
|
- Buyer is responsible for all costs related to transporting the item.
- Item must be picked up within 8 business days of the auction, or the buyer will incur storage charges.
- The location information will be provided once full payment has been received.
Shipping Quotes
Pickup Terms
Failure to follow these terms may result in the seller turning away the attempt to pick up the purchased item.
- You must call at least 24 hours in advance to schedule pickup
- No Loading Dock, Ramps, or Forklift Available: Only RGN or trailers with ramps can be used to pick up this item at this location. Seller will not allow item to be loaded on a step-deck or flatbed trailer without the appropriate ramps.
- Driver MUST bring a copy of the IronPlanet Transportation Release to pick the item up.
-
Within 3 business days after the auction, the buyer must submit full payment, including applicable taxes and fees.
- Buyer must pay a transaction fee, based on the final selling price:
| Final Selling Price |
Transaction Fee |
| €1 to €5,000 |
10% of the final selling price |
| €5,000 to €31,800 |
3.85% of the final selling price (min €500) |
| Above €31,800 |
€1,225 |
- Payment can be made by wire transfer (recommended), certified bank check (U.S. customers only), or credit card (when full payment amount is $5,000 or less).
- All bids are binding and cannot be retracted. Failure to make full payment will result in a Default Fee.
If you are looking to finance your purchase, we recommend you get pre-approved in advance of the auction. Here is a company we recommend who specialize in equipment financing:
Cat Financial
Financing for the way you work Your business is always changing, and so are your financial needs. You need quality equipment to get your work done and financing solutions that make sense for you. Count on a company that understands the work you do.
*Currency conversions are an estimate provided for informational purposes only.
|